Q: How to install Sand Making Machine, how to scientifically install sand making machine?
A: First explain, also known as Sand impact crusher! First of all,
you do not worry about this issue, we will have a professional team to
provide you with all the technical support and security, to help you
choose the right venue and so on. Here, first tell us, there is also the
understanding of yourself!
1,whether it is installed indoors or outdoors, there must be built
into the concrete foundation. In this case, this basic requirement is
that it must be able to withstand the weight of several times the Sand.
2, the installation, Sand leveling should make vertical and horizontal axis.
3, in the sand on-site installation, should still be on the Sand
conduct a comprehensive inspection. For example: check the oil pipe is
connected securely, trial operation before loading a heavier oil;
inspection grid component lubricant tube is connected securely,
carefully check the impeller for foreign objects, if this morning to
give discharge.
4 Check to make sure the direction of motor rotation direction signs
with Sand, if inconsistent, motor wiring should be adjusted so that
rotation consistent with signs is prohibited rotating in opposite
directions.
5 Because Sand is a dual motor drive, motor, respectively, have the
same number on both sides of the belt is connected with the spindle
assembly, should be adjusted accordingly straight. After checking
correct before production, the production carried out before the first
empty load test machine, confirmed by the test machine is no problem
before formal production.
6 Turn the machine empty load operation time was 4 hours, the load
test run feed size specifications of various models in strict accordance
with the requirements greater than the specified prohibited materials
into; uniform continuous feeding, feeding reach full capacity until the
Sand; Load commissioning time 8-24 hours.
7 checks before starting vortex chamber door is closed tightly
observed, to prevent the material from observing the door out of the
vortex chamber, dangerous.
8 start-up sequence is: Discharge – Sand – feeding.
9 must be unloaded start until Sand operating normally before feeding.
10 Shutdown and boot sequence opposite.
11 during operation, without excessive vibration and unusual noise,
otherwise, should stop to check and find out why to be addressed.
12 Every 100 hours of operation should be added amount of grease.