Q: I want to know some of the stone production line, stone production line price.
Ask when the production of 200 tons stone production line, when the
production of 300 tons of stone production line approximate price?
A: The whole model of the machine according to your
production site as well as the specific situation to go with, so
different scene, a different configuration of the machine production
requirements are not the same, the entire machine with down prices are
not the same. We can according to your specific requirements
configuration produces 100 tons, 200 tons, 300 tons, 400 tons, 500 tons
of stone production line. Stone according to your specifications,
production, stone use requirements, to provide you the most reasonable
and economical equipment configuration.
没有评论:
发表评论